NEWS

The role of power transformers

Power transformers are one of the main equipment for power plants and substations. The role of the transformer is not only to increase the voltage to send electricity to the electricity area, but also to reduce the voltage to the voltage used at each level to meet the needs of electricity. In short, both boost and buck must be done by a transformer. In the process of transmitting electrical energy in the power system, voltage and power losses are inevitably generated. When the same power is delivered, the voltage loss is inversely proportional to the voltage, and the power loss is inversely proportional to the square of the voltage. Using a transformer to increase the voltage reduces the loss of power transmission.
Transformer is composed of two or more coil windings wound on the same core, the windings are connected by alternating magnetic field and work according to the principle of electromagnetic induction. The installation location of the transformer should be considered for easy operation, maintenance and transportation, and a safe and reliable place should be chosen. The rated capacity of the transformer must be reasonably selected when using the transformer. When the transformer is running at no load, a large amount of reactive power is required. These reactive powers are supplied by the power supply system. If the capacity of the transformer is too large, it not only increases the initial investment, but also makes the transformer run at no load or light load for a long time, which increases the proportion of no-load loss, reduces the power factor, and increases the network loss. This operation is neither economical nor reasonable. If the transformer capacity selection is too small, the transformer will be overloaded for a long time and the equipment will be damaged. Therefore, the rated capacity of the transformer should be selected according to the needs of the electrical load, and should not be too large or too small.
2019/06/03 13:48:46 8365 click

Related Documents

Copy right ? 2019 Yixing Wansheng Transformer Co., Ltd.

主站蜘蛛池模板: 芷江| 什邡市| 丹凤县| 阿拉善左旗| 临城县| 靖安县| 鹿泉市| 镇巴县| 长岛县| 浑源县| 明水县| 东乡县| 广安市| 天门市| 兴义市| 神农架林区| 张北县| 嘉善县| 格尔木市| 苏尼特左旗| 阳东县| 汤原县| 汪清县| 新民市| 扶余县| 泽州县| 扎兰屯市| 西平县| 龙陵县| 石门县| 星子县| 霍林郭勒市| 台东市| 鄂尔多斯市| 清原| 台中县| 遂川县| 长岛县| 宜黄县| 浦北县| 五大连池市|